Corrective Treatment / Post-construction Treatment

CORRECTIVE OR POST-CONSTRUCTION TREATMENT

The objective of this treatment is to termite-proof a building against subterranean termite’s infestation by creating a termiticidial barrier of up to 40 mm thick around the perimeter ground beams and columns of the building.

In order to reach the soil under slab-on-ground building, it is necessary to drill holes through the slab to inject termiticidial fluid.

Drilling is accomplished by heavy-duty “rotary hammer” drill type and holes of 20 mm diameter are usually drilled.

The holes are drilled just over 150 mm from the vertical wall and these holes spaced 800 mm apart.

Internal foundation walls or any internal wall extending downwards into the soil will be treated in the same way as given above by spaced drilling and injection of insecticide.

5 litres of termiticide at the correct concentration will be injected under pressure into each hole so drilled.

EFFECTIVENESS / WARRANTY

On completion of the job, METRO PEST CONTROL SERVICES will issue a certificate of warranty for THREE  (3) YEARS.

The below images show the process of the treatment


Image 1 : Drilling the hole through the slab

Image 2 : Injecting termiticidial fluid into the drilled hole

Image 2 : Covering up the hole after injecting termiticial has been done


Please contact us if you have any inquiry which is stated below the website. Thank you.




4 comments:

  1. So when a person is out looking for a paving solution, they simply opt for sandstone paving because it is what they already know about -even if that knowledge only came from an advert by an aggressive vendor. Asphalt Paving Colorado Springs CO

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. he same room without ever having to roll out a sleeping bag or make due with the floor. triple twin bunk bed

    ReplyDelete